Material: CK45 and 42CrMo4 are both commonly used high-quality steel grades. CK45 is a carbon steel known for its high strength and good machinability, while 42CrMo4 is an alloy steel known for its high tensile strength, toughness, and wear resistance. The combination of these two materials in a single steel pipe provides a balance of strength, durability, and performance.
Cold Drawing Process: The cold drawing process involves pulling a normalized CK45 42CrMo4 steel pipe through a die at room temperature to reduce its diameter and improve its surface finish. Cold drawing enhances the pipe's dimensional accuracy, surface quality, and mechanical properties. It also increases the pipe's tensile strength and hardness.
Normalized CK45 42CrMo4 Cold Drawn Steel Pipe
Applications: Normalized CK45 42CrMo4 cold-drawn steel pipes find applications in various industries, including mechanical engineering, automotive, and manufacturing. They are commonly used in components that require high strength, toughness, and durability, such as hydraulic cylinders, machine parts, and structural elements.
Mechanical Properties: The normalization process and cold drawing contribute to the improved mechanical properties of the steel pipe. Normalized CK45 42CrMo4 cold-drawn steel pipes typically exhibit high tensile strength, good impact resistance, and excellent hardness. These properties make them well-suited for demanding applications where strength and durability are critical.
Feature
1. exact diameter than seamless pipe
2. High precision of carbon tube can be done with tolerance H9, H10
3. Cold finished makes high precision, good roughness, and nice quality
4. Honed tube or SRB tube can be used for hydraulic cylinder directly
5. High mechanical property better than seamless pipe
Product Details
Product Type: |
Normalized CK45 42CrMo4 Cold Drawn Steel Pipe |
Material: |
Carbon Steel Tube |
Outer Diameter: |
30-250mm |
Wall Thickness: |
2-30mm |
Material Grade: |
ST52,E355,CK45,A106,A53,SKTM11A,STKM13A,STKM13C,S45C,and so on |
Delivery Condition: |
BK/BKS/GBK/NBK |
Delivery time: |
within 20-30 days after receiving prpayment |
Trade Terms: |
FOB Shanghai |
Inquire Form